Sample Post: What We Need for a Fence Quote
Have these ready when you fill in the form: property line, run length, gate positions, access and what is on the line now.

Have these ready when you fill in the form:
- Property line. A survey if you have one, or the corners you know.
- Run length. Roughly where the fence starts and stops, and whether it closes in the whole yard.
- Gate positions. Where you want openings for people, mowers or a vehicle.
- Access. How a crew gets to the line, and whether anything blocks the path.
- What is on the line now. An old fence, trees, a drainage ditch or a shed close to the boundary.
A rough idea is enough to start. We will ask for the rest.
Find your property line before the first post
Before posts go in, you need to know where your boundary runs.
If you already have a survey, keep it handy when you ask for a quote.
Call 811 before post holes
Fence posts go underground, and so do utility lines. 811 is the national call-before-you-dig number, and Alabama 811 lists fence posts as a project to call about.
Alabama 811 asks for notice at least 2 to 10 full working days before you start. The national 811 program’s Alabama page puts the minimum at two full working days, not counting the day you call. Make the call first, then set the post-hole date.
Where we work
Our base is in Elberta, AL. From there we take fence work across Baldwin County, including Foley. Not sure your address is in range? Send the form and ask, and we will tell you. See our fencing page for more.
